Sector

Commercial

Subsector

Office

Client

Charter Hall

Completed

2014

Team Leader

John Berlese

Project Manager

FKP

Architect

ML Design

Interior Designer

HASSELL

Civil Engineer

ADG Engineers

Structural Engineer

ADG Engineers

Electrical Engineer

EMF Griffiths

Mechanical Engineer

EMF Griffiths

Hydraulic Engineer

EMF Griffiths

Lift Consultant

Vertrans Consultants

Fire Consultant

EMF Griffiths

Quantity Surveyor

Rider Levett Bucknall

Share

icons

$79M

Project value

icons

89

Weeks to build

icons

5 Star

Green Star

icons

24,521m

Built area

Part of the redevelopment of the former Gasworks complex at Newstead, Tower G achieved a PCA A Grade Commercial Office rating, as well as all of its targeted environmental sustainability design ratings, including a 5 Star Green Star Office Design and As-Built rating; and a 5 Star NABERS Energy rating.

The 14 level building consists of three large floorplates of around 3000m

HB_C_Gasometer2TowerG (5) (LowRes).jpg
HB_C_Gasometer2TowerG (6) (LowRes).jpg
HB_C_Gasometer2TowerG (7) (LowRes).jpg
HB_C_Gasometer2TowerG (8) (LowRes).jpg
HB_C_Gasometer2TowerG (10) (LowRes).jpg
HB_C_Gasometer2TowerG (11) (LowRes).jpg
HB_C_Gasometer2TowerG (12) (LowRes).jpg

100 Skyring (BOQ)

Office

Find out more about this project